My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-30_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2012-04-30_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:01 PM
Creation date
5/1/2012 8:33:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
4/30/2012
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />Transmissivity <br />(gpd /ft) <br />Specific Yield <br />Distance to <br />River (ft) <br />Distance to <br />Alluvial <br />Boundary (ft) <br />Phase 1 <br />97,100 <br />0.15 <br />1,032 <br />2,647 <br />Phase 2 <br />97,100 <br />0.15 <br />964 <br />2,206 <br />Phase 7 <br />97,100 <br />0.15 <br />420 <br />2,250 <br />Month <br />Phase 1 <br />Phase 2 <br />Phase 7 <br />1 <br />49.15% <br />54.46% <br />76.62% <br />2 <br />34.43% <br />36.62% <br />19.16% <br />3 <br />11.76% <br />8.92% <br />4.22% <br />4 <br />4.65% <br />- <br />- <br />Mr. Paul Bruss, E.I. <br />April 30, 2012 <br />DEPLETIONS <br />Page 2 <br />Annual site depletions consist of 44.9 acre -feet of evaporation losses, 21.4 acre -feet of <br />pumping for dust control, and 29.4 acre -feet of water removed in the mining product, for a total <br />depletion of 95.7 acre -feet for each of the plan years (February 1, 2012 — January 31, 2013 and <br />February 1, 2013 — January 31, 2014). The monthly distribution of the values and the lagged <br />effects on the Arkansas River, are detailed on your Tables 1 -4, which are attached. The lagged <br />depletions were calculated individually for each Phase of the operation based on the <br />characteristics below. <br />Lagging factors for each of the Phases were calculated using the Glover Method, <br />normalized to the number of months required for 95% of depletions to affect the river, and are <br />provided in the following table. <br />Historical phreatophyte and effective precipitation were determined to partially offset <br />gross evaporation at the site. The credit from historical phreatophyte consumptive use was <br />calculated to be 3.83 acre -feet per year from 5.6 acres of equivalent 100% canopy cover native <br />vegetation in Phase 1, and 4.68 acre -feet per year from 3 acres of 100% canopy cover native <br />vegetation in Phase 7. Effective precipitation was claimed on the remaining exposed surface <br />area, and was calculated as 70% of total precipitation. <br />REPLACEMENT <br />The replacement water is proposed to be from 3 sources. The first is Transit Mix's <br />ownership of 2.92 cfs of the Hamp -Bell ditch that historically irrigated 67 acres and is estimated <br />to yield 170.3 acre -feet annually in an average year and 153.9 acre -feet annually in a dry year. <br />The second is consumable water leased from the Pueblo Board of Water Works (PBWW). <br />Transit Mix currently has a lease with Pueblo that will provide 106 acre -feet of totally <br />consumable water annually through September 30, 2012. Transit Mix plans to extend the lease <br />through January 2014. The third is 32.88 ac -feet (of the 65.88 acre -feet from 60 shares) from <br />Transit Mix's owner ship of Twin Lakes Reservoir water. <br />The excess credits from the Hamp -Bell Ditch water rights were changed in Case No. <br />03CW8 to commercial and augmentation uses. Depletions at the site that cannot be covered <br />by ditch credits, and depletions caused by elimination of return flows due to dry -up under the <br />
The URL can be used to link to this page
Your browser does not support the video tag.