Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit production: 449.16 LCY /hr <br />Adjusted fleet production: 449.16 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Net correction: 0.4391 <br />1 Dozer(s) <br />$0.351 /LCY <br />5.05 Hours <br />$796.49 <br />Task # X03 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />