Laserfiche WebLink
Task description: Replace topsoil to five drill pads <br />Site: 2012 Exploration Project <br />PROJECT IDENTIFICATION <br />Task #: X03 State: Colorado <br />Date: 4/23/2012 County: Routt <br />User: KAG <br />Cost Breakdown: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS XR Series II <br />Horsepower: 238 <br />Blade Type: Semi - Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $157.74 <br />Total Fleet Cost/Hour: $157.74 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,016 <br />Swell factor: 1.125 <br />Loose volume: 2,268 LCY <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Average push gradient: <br />Average site altitude: <br />5% <br />7,000 feet <br />$43.26 <br />$75.99 <br />$0.00 <br />$38.49 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Unadjusted hourly production: 1,022.9 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Material weight: 2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 0.900 <br />Dozing method: 1.000 <br />BULLDOZER WORK <br />Page 1 of 2 <br />Permit Action: X201223103 Permit/Job #: X201223103 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />Abbreviation: None <br />Filename: X231 -X03 <br />CIRCES Cost Estimating Software <br />