Laserfiche WebLink
PSCM Technical Revision 03 <br />Page 2 <br />South Facilities <br />— Revised operational pad layout and facilities /stricture locations <br />— Revised road locations <br />— Replacement and new power line location <br />— Drainage and sediment control network <br />The drainage and sediment control network and design have been revised to provide improved <br />runoff control through the operations area. These changes include designing and relocating <br />various ditches and culverts. <br />Additional topsoil will be salvaged in both the North and South facility areas. This topsoil will <br />be stockpiled for future reclamation. <br />We would appreciate your consideration and cooperation in facilitating timely review and <br />approval of this submittal. Once you have had opportunity to review this submittal package, <br />please feel free to contact me at 970 - 276 -7003 with any questions or comments. <br />Best regards, <br />B. Scott Cowman <br />Senior Environmental Specialist <br />Peabody Sage Creek Mining LLC <br />Peabody Sage Creek Mine <br />attachment(s) <br />cc: Foster Kirby (OSMRE) <br />Jennifer Maiolo (BLM) <br />