Laserfiche WebLink
Peabod <br />41111111111111111111 ENERGY <br />April 25, 2012 <br />Peabody Sage Creek Mining, LLC <br />Mr. Jason Musick <br />Colorado Division of Reclamation Mining & Safety (DRMS) <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />Re: Peabody Sage Creek Mine No. C- 2009 -087) <br />Technical Revision (TR -03) Facilities and Disturbance Area Update <br />Mr. Musick: <br />Peabody Sage Creek Mine <br />PO Box 250 <br />36600 Routt County Road 27 <br />Hayden, CO. 81639 <br />RECEAVE <br />AN 25 7n17 <br />Dviywit u , r keaamation , <br />Mining and Safety <br />Peabody Sage Creek Mine (PSCM) began constructing the south facilities area in the summer of <br />2011 according to the approved proposed facilities layout. During and following the 2011 <br />construction season it became apparent that revisions /reconfiguration to the proposed layout <br />were needed in the operations /facilities plan layout and the drainage network. <br />PSCM proposes to expand the current disturbance area specifically associated with the operation <br />of the underground mine. This "new" mining associated disturbance area will increase by 77.2 <br />acres to a total of 355.8 acres to allow construction of an improved drainage system and for <br />potential expansion of the upper pad to accommodate possible future coal handling facilities. <br />The disturbed area reported on the DRMS Application Form, which includes all areas disturbed <br />by the previous Seneca II operations and any additional new area disturbed by PSCM, will <br />increase by 11.8 acres. <br />This technical revision presents an upgraded operations plan that includes; <br />1) An expansion of the mining related disturbance area <br />2) An updated facilities layout <br />3) A revised operational drainage and sediment control plan <br />Both north and south facility maps have been updated to portray the proposed operational layout <br />and to include facilities and structures not currently included in the existing layouts. These <br />updates include: <br />North Facilities <br />— Revised guard shack layout <br />— New water well location <br />— Above ground propane tank locations <br />— Power line locations <br />