My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-25_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2012-04-25_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:50 PM
Creation date
4/25/2012 10:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
4/25/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
RN6
Email Name
SLB
SB1
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 83 of 116 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 457.89 <br />Adjusted single truck /loader team production: 419.06 <br />Adjusted multiple truck/loader team production: 419.06 <br />min <br />1 <br />490.00 <br />3.00 <br />5.00 <br />8.00 <br />1381 <br />0.397 <br />Return Route: <br />Haul Time: 0.397 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />LCY/Hour Adjusted for job efficiency: <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 457.89 <br />Adjusted single truck /loader team production: 419.06 <br />Adjusted multiple truck/loader team production: 419.06 <br />min <br />1 <br />490.00 <br />-3.00 <br />5.00 <br />2.00 <br />2905 <br />0.204 <br />LCY/Hour <br />L C Y/Hour <br />Fleet size: I Team(s) Total job time: 50.64 Hours <br />Unit cost: $0.955 /LCY Total job cost: $20,272.54 <br />minutes <br />minutes <br />minutes <br />419.06 L C Y/Hour <br />228.94 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.204 <br />Total Truck Cycle Time: 3.309 <br />Loading Tool unit <br />Production 504.90 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />275.83 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 457.89 <br />Adjusted single truck /loader team production: 419.06 <br />Adjusted multiple truck/loader team production: 419.06 <br />JOB TIME AND COST <br />LCY/Hour <br />L C Y/Hour <br />Fleet size: I Team(s) Total job time: 50.64 Hours <br />Unit cost: $0.955 /LCY Total job cost: $20,272.54 <br />minutes <br />minutes <br />minutes <br />419.06 L C Y/Hour <br />228.94 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.