Laserfiche WebLink
Page 82 of 116 <br />Truck Bed (volume) Basis <br />Struck Volume: <br />12.00 <br />LCY <br />Heaped Volume: <br />18.00 <br />LCY <br />Average Volume: <br />15.00 <br />LCY <br />Adjusted Volume: <br />18.00 <br />LCY <br />Truck Ownership: <br />Final <br />Truck Volume Based on Number of Loader Passes: 15.21 LCY <br />Loading Tool Capacity <br />Operation: <br />I Constant op eration -0.04 <br />1 -0.040 <br />1 (Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />3.900 <br />1 (Cat HB) <br />LCY (heaped) <br />Bucket Fill Factor: <br />0.975 <br />Loose material - mixed moist aggregates (95- 100 %) 0.975 <br />Adjusted Capacity: <br />3.803 <br />LCY <br />Job Condition Corrections: Site Altitude (ft.): 7500 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj : <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cvcle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />- 0..040 <br />(Cat HB) <br />Operation: <br />I Constant op eration -0.04 <br />1 -0.040 <br />1 (Cat HB) <br />Dump Target: <br />I Nominal target 0.00 <br />1 0.000 <br />1 (Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 1.308 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />enetration 5.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.080 minutes <br />0.403 minutes <br />1.308 minutes <br />Minutes Adjusted for site altitude: 0.500 Minutes <br />Minutes Adjusted for site altitude: 1.308 Minutes <br />Minutes Adjusted for site altitude: 0.900 Minutes <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />4 passes <br />CIRCES Cost Estimating Software <br />