My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-23_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-04-23_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:44 PM
Creation date
4/25/2012 7:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/23/2012
Doc Name
2012 Midterm Review Cost Estimate & Adequacy Questions
From
Jason Musick
To
Zack Trujillio
Type & Sequence
MT6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade D- Portal Area <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 002 State <br />Date: 4/5/2012 County <br />User: JDM <br />Colorado <br />Rio Blanco <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: <br />Semi - Universal <br />Attaclunent: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown <br />Total unit Cost/Hour: $259.35 <br />Total Fleet Cost/Hour: $1,037.41 <br />MATERIAL OUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />160,750 <br />1.111 <br />178,593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly production: 546.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,300 feet <br />2,743 lbs/LCY <br />Weight description: User Provided <br />Abbreviation: None <br />Filename: C018 -002 <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $259.35 <br />Total Fleet Cost/Hour: $1,037.41 <br />MATERIAL OUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />160,750 <br />1.111 <br />178,593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV <br />Operator Study <br />HOURLY PRODUCTION <br />Average push distance: 250 feet <br />Unadjusted hourly production: 546.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,300 feet <br />2,743 lbs/LCY <br />Weight description: User Provided <br />Abbreviation: None <br />Filename: C018 -002 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.