My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-23_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-04-23_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:44 PM
Creation date
4/25/2012 7:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/23/2012
Doc Name
2012 Midterm Review Cost Estimate & Adequacy Questions
From
Jason Musick
To
Zack Trujillio
Type & Sequence
MT6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4695 <br />Adjusted unit production: <br />Adjusted fleet production: <br />256.35 LCY/hr <br />1025.4 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.012/LCY <br />Total job time <br />Total job cost <br />174.17 Hours <br />$180,685.55 <br />Page 8 of 164 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.