My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-23_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-04-23_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:44 PM
Creation date
4/25/2012 7:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/23/2012
Doc Name
2012 Midterm Review Cost Estimate & Adequacy Questions
From
Jason Musick
To
Zack Trujillio
Type & Sequence
MT6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 001 Page 5 of 164 <br />SCRAPER TEAM WORK <br />Task description: Regrade D- Portal Area <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 4/5/2012 County: Ri o Blanco <br />COSTShift basis: 1 per day <br />iption <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $2,169.72 <br />MATERIAL QUANTITIES <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: 2,743 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 29.75 LCY <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost /hour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$2,169.72 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $2,169.72 <br />MATERIAL QUANTITIES <br />Initial volume: 240,000 CCY Swell factor: 1.111 <br />Loose volume: 266,640 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Permit Volume IV Operator Study <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis <br />Material weight: 2,743 lbs/LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 29.75 LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />Abbreviation: None <br />Filename: C018 -001 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.