My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:45 PM
Creation date
4/24/2012 10:46:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
4/24/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Jim Stark
To
Marcia Talvitie
Email Name
JRS
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1,116.55 LCY/hr <br />2233.1 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.398/LCY <br />Total job time: <br />Total job cost: <br />9.75 Hours <br />$8,666.38 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.