Laserfiche WebLink
Task description: <br />Site: New Horizon North Mine <br />BULLDOZER WORK <br />Facilitics Area <br />Permit Action: 2012 New Permit <br />Estimate <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 02- Mar -12 County: Montrose <br />User: JRS <br />Agency or organization name: <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D1 1R - 11U <br />850 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />DRMS <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -004 <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL OUANTITIES <br />Initial Volume: 19,360 <br />Swell factor: 1.125 <br />Loose volume: 21,780 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Map 2.05.3(3)• <br />Cat Handbook <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0 % <br />Average site altitude: 5,000 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$131.18 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL OUANTITIES <br />Initial Volume: 19,360 <br />Swell factor: 1.125 <br />Loose volume: 21,780 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Map 2.05.3(3)• <br />Cat Handbook <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0 % <br />Average site altitude: 5,000 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />