Laserfiche WebLink
April 19, 2012 C- 1981 - 018 /Deserado Mine ZTT <br />The entrance point to the culver under the road prior to the Explosives SAE could not be located. It is a possible <br />the entrance has been buried by road grading. All road water redirected by the culvert would eventually pond and <br />run off towards the Scullion Gulch. <br />The culvert from the truck load out area and culvert beneath the road crossing from the Haul Road and the Access <br />Road to Sedimentation Pond PP -2 needs the discharge points cleaned out. <br />The sump just prior to the culvert for Sedimentation Pond SS -2 is almost full of sediment and will need cleaned. <br />A sump was created in the Temporary Refuse Stockpile area to collect water. Water collected in the sump either <br />evaporates or settles with no discharge occurring. <br />B -Seam Dewatering Pond 91. Sump prior to Sedimentation Pond SS -2. <br />Sump in Temporary Refuse Stockpile. <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 4 <br />