Laserfiche WebLink
April 17, 2012 C- 1980 - 005 /Seneca II Mine JDM <br />Inspection Topic Summary <br />NOTE: YAnspected N =Not Inspected R= Comments Noted V= Violation Issued NA =Not Applicable <br />• -Air Resource Protection <br />R -Roads <br />• -Availability of Records <br />Y -Reclamation Success <br />N - Backfill & Grading <br />Y - Revegetation <br />NA - Excess Spoil and Dev. Waste <br />NA - Subsidence <br />NA - Explosives <br />Y - Slides and Other Damage <br />Y - Fish & Wildlife <br />N - Support Facilities On -site <br />R - Hydrologic Balance <br />R -Signs and Markers <br />Y - Gen. Compliance With Mine Plan <br />NA - Support Facilities Not On -site <br />R - Other <br />NA - Special Categories Of Mining <br />NA - Processing Waste <br />N -Topsoil <br />COMMENTS <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, <br />4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br />4.05.13; Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />The construction work for the repair of established drainage SIIPM -8 has been initiated. The lower portion of the <br />drainage above the turn to Pond 008 has been formed, with rock to be installed. No further damage was identified <br />to the drainage at the time of the inspection. No problems or maintenance items were noted with the exception of <br />the following: <br />- small gullies and erosional features were observed initiating above V -Ditch Al. These gullies have not breached <br />the V -Ditch #1 channel, although they will need to be a ddressed to prevent additional damage. <br />- <br />3_ <br />Repair Work at Lower End of SIIPM-8 <br />Pond 008 was stable and discharging at the time of the inspection. Embankments are stable and well vegetated. <br />The water in the pond and through the discharge was clear. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 2 of 4 <br />