Laserfiche WebLink
92 <br /> The total topsoil available for Nucla Mine is: <br /> I2,'1. <br /> 127.3 acre-feet (Tab 9, Attachment 1, Section 3) <br /> + 8.0 acre-feet (Salvageable shop area soils) <br /> 135.3 acre-feet (Total) <br /> Titus, the anticipated topsoil replacement depth for Nucla Mine should <br /> be revised to approximately: <br /> 135.3 acre-feet = 1.0 feet <br /> 130.5 acres <br /> CONCLUSION <br /> Similar types of mining disturbance will occur in the shop area as <br /> do in the West Pit Area. Prior to disturbance, about twenty (20) <br /> inches of topsoil will be salvaged from the Shavano soil type to <br /> be redistributed on regraded reclamation areas or temporarily stored <br /> in topsoil stockpiles. Approximately twelve (12) inches of topsoil <br /> will be replaced after the area is graded to final contour. <br /> D E C 1 8 1980 <br />