Laserfiche WebLink
3.0 PCC NUCLA WATER-SUPPLY REQUIREMENTS <br /> An industrial-water supply is needed for use during <br /> mining and reclamation, and for use as an augmentation <br /> supply. Estimates of the quantities of water required were <br /> obtained from several sources. PCC determined the water <br /> requirements for dust suppression and construction compaction <br /> make-up water for the NUCLA and NUCLA EAST mining areas. <br /> Inflow from the overburden aquifer into the NUCLA EAST pit, <br /> and the resulting water-level change (which may impact water <br /> rights and require augmentation) were calculated by GeoTrans, <br /> Inc. using data supplied by PCC. Evaporative losses from <br /> existing and proposed ponds were determined by GEOTRANS. <br /> It is our understanding that the NUCLA mining area does <br /> not have to be irrigated following reclamation, whereas PCC <br /> is required to return the NUCLA EAST area to its premining <br /> land use and may need to provide water for irrigation. <br /> However, as existing water rights will not be impacted or use <br /> of the water changed, irrigation-water requirements will not <br /> be addressed further in this report. <br /> 3 . 1 OPERATIONAL REQUIREMENTS <br /> During the mining phase, PCC's water-supply requirements <br /> are in two major use categories, municipal and industrial . <br /> 14 <br /> GEOTRANS, INC. <br />