Laserfiche WebLink
convey runoff from upgradient disturbed areas to the 007 pond, which is located at the <br /> southwest corner of the permit boundary. The City of Nucla has previously constructed the <br /> City's sewer line within the 100-foot stream buffer zone. The 007 East Ditch needs to be <br /> constructed close to the permit boundary in order to allow all drainage from disturbed <br /> areas to be intercepted and routed to Pond 007, to allow access around the south end of <br /> the pits and to maximize coal recovery. The stream buffer zone area within the permit <br /> boundary is approximately 0.4 acres of a very narrow strip of land approximately 860 feet <br /> long where Calamity Draw meanders close to the permit area. <br /> 16-7a Revised 08/19/88 <br />