My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-20_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1988-04-20_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 2:04:43 PM
Creation date
4/19/2012 8:29:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
4/20/1988
Doc Name
Sedimentation Pond 005
Section_Exhibit Name
Tab 13 Attachment E
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN ANALYSIS <br /> GENERAL <br /> Sedimentation Pond 005 was evaluated and constructed to meet or exceed <br /> the design and performance requirements of the CMLRD while utilizing as <br /> much of the existing structure and topography as was possible. Pond 005 <br /> was constructed to adhere to the following specifications: <br /> 1. Provide storage for the runoff from the 10-year, 24-hour <br /> precipitation event without having any discharge through the <br /> emergency spillway (1.13 ac-ft. ). <br /> 2. Provide an emergency spillway capable of passing runoff from <br /> the 25-year, 24-hour storm event (1.45 ac-ft. ) . <br /> 3. Provide adequate storage for the sediment generated from the <br /> 10-year, 24-hour (MUSLE) storm event (3.0, 10-year, 24-hour <br /> MUSLE storm events or 0.419 ac-ft.). <br /> 4. Provide a nonclogging dewatering device and principal spillway <br /> that will provide adequate detention time for the 10-year, <br /> 24-hour storm event and still allow a method to dewater the <br /> pond to the 100 percent sediment storage level in a reasonable <br /> amount of time. <br /> HYDROLOGY <br /> The hydrology of the watershed was analyzed by utilizing the SEDIMOT II <br /> computer modeling program. In performing this analysis, the <br /> characteristics of the minesite and reclamation procedures along with <br /> onsite sediment control procedures were considered. Addendums A, B, and <br /> C contain complete listings of the SEDIMOT II inputs and outputs for the <br /> 10-year, 25-year, and 100-year design storms, respectively. Table 1 is <br /> a summary of these results. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.