Laserfiche WebLink
April 11, 2012 C- 1983 - 059 /Terror Creek Loadout JRS <br />TOPSOIL — Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br />- Both of the topsoil piles on site were well vegetated at the time of the inspection. There were no erosional <br />problems noted on either of the piles. Both topsoil stockpiles had the appropriate marker in place. <br />DOCUMENTS RECEIVED: None <br />This completes the 11 April 2012 partial inspection of the Terror Creek Loadout. <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 4 <br />