My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-17_REVISION - M1977493 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2012-04-17_REVISION - M1977493 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:24 PM
Creation date
4/18/2012 4:07:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
4/17/2012
Doc Name
Letter of Certification for Robinson Lake Pump Station and Pipeline
From
CLIMAX
To
ECS
Type & Sequence
TR17
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. W. WHEELER <br />& ASSOCIATES, INC. <br />Water Resources Engineers <br />April 6, 2012 <br />Raymond Lazuk <br />Climax Molybdenum Company — Climax Mine <br />Hwy 91 — Fremont Pass <br />Climax, Colorado 80429 <br />WWW.WWWHEELER.COM <br />RE: Climax Mine Permit No. M- 1977 -493, Technical Revisions TR -14 and TR -17 <br />Letter of Certification for Environmental Protection Facility <br />Robinson Lake Pump Station and Pipeline <br />Dear Ray: <br />The designs of the new Robinson Lake Pump Station and Pipeline at the Climax Mine were <br />submitted to the Division of Reclamation, Mining, and Safety as part of TR -14 in May 2008. <br />The design of the pipeline was modified and resubmitted as TR -17 in March 2011. The <br />pump station pumps water from Robinson Lake through the new pipeline to the new mill <br />water storage tank for delivery to the new mill. The construction of the pump station and <br />pipeline are now complete and these facilities are ready for service. In accordance with <br />Rule 7.3.2 (2), attached is the signed and stamped certification that these facilities were <br />constructed in general conformance with their designs. Note that the pump station and <br />pipeline are part of several facilities that were approved with TR -14. Separate certifications <br />will be submitted for the other facilities. <br />The pump station building was constructed in 2008 in accordance with the design, as <br />described in TR -14. The piping inside the pump station was completed in 2011. The <br />general configuration and function of the pump station remain as described in TR -14. <br />However, a few modifications were made to the pump station during final design, as <br />described below: <br />1. The piping inside the pump station was changed from 24- inch - diameter to 36- <br />inch - diameter to reduce friction and minor losses. <br />3700 S. INCA STREET I ENGLEWOOD, CO 801 1 0-3405 <br />303-761-4130 1 FAX 303 -76 1 -2802 <br />A0A000A' <br />
The URL can be used to link to this page
Your browser does not support the video tag.