Laserfiche WebLink
PART I <br /> Page le of 19 <br /> Permit No. CO-0000213 <br /> B. MONITORING REQUIREMENTS (Continued) <br /> 2. Montioring Requirements Applicable During Active Periods l/ (Continued) <br /> Effluent Parameter Measurement Frequency d/ Sample Type e/ <br /> Flow, MGD Weekly Instantaneous <br /> or Continuous <br /> Total Suspended Solids, mg/1 Monthly Grab <br /> Total Iron, mg/l Monthly Grab <br /> Oil and Grease, mg/1 f/ Weekly Visual or Grab <br /> pH, s.u. Weekly Grab <br /> Settleable Solids, ml/1 J/ Weekly Grab <br /> Salinity &/ Quarterly h/ Grab <br /> Reporting of the above data shall be on a quarterly basis. Refer to <br /> Part I.D.2 for specific requirements. Should a precipitation event or <br /> snowmelt occur, the permittee shall submit proof in order for an <br /> exemption to be claimed. Said proof shall be submitted as an <br /> attachment to the Discharge Monitoring Report (DMR) for the appropriate <br /> period. <br /> Sampling by the permittee for compliance with the monitoring <br /> requirements specified above shall be performed at the following <br /> locations(s): Discharge points 001, 002, 003, 004, 005, and 006, as <br /> shown in Figure 1 on page lf. <br /> Monitoring by the Division for the purpose of compliance and/or <br /> enforcement of the effluent limitations shall be performed as per <br /> "Sample Type" specified above. <br /> See Part I.C. for Footnotes. <br /> Code: i - 10 Date: 1 - 84 <br /> 7-6-7 <br />