Laserfiche WebLink
PART I <br /> Page ld of 19 <br /> Permit No. CO-0000213 <br /> B. MONITORING REQUIREMENTS <br /> 1. Monitoring Requirements Applicable During Inactive Period k/ <br /> In order to obtain an indication of the probable compliance or non- <br /> compliance with the effluent limitations specified in Part 1.A, the <br /> permittee shall monitor all effluent parameters at the following <br /> required frequencies*: <br /> Effluent Parameter Measurement Frequency d/ Sample Type e/ <br /> Flow, MGD Monthly Instantaneous or <br /> Continuous <br /> Total Suspended Solids, mg/1 Monthly Grab <br /> Total Iron, mg/1 i/ Monthly Grab <br /> Oil and Grease, mg/1 Monthly Visual or Grab <br /> PH, S.U. Monthly Grab <br /> Salinity Quarterly Grab <br /> * The permittee shall notify the Division in writing upon resumption of <br /> active operations. The monitoring requirements of Part I.B.2 on the next <br /> page shall automatically apply during active periods. <br /> Self-monitoring samples taken in compliance with the monitoring <br /> requirements specified above shall be taken at: Discharge points 001, <br /> 002, 0030 004, 005, and 006,' as shown in Figure 1 on page If. <br /> 2. Monitoring Requirements Applicable During Active Periods k/ <br /> In order to obtain an indication of the probable compliance or non- <br /> compliance with the effluent limitations specified in Part 1.A, the <br /> permittee shall monitor all effluent parameters at the following <br /> frequencies: <br /> See Part I.C. for Footnotes. <br /> Code: i - 10 Date: 1 - 84 <br /> 7-6-6 <br />