My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_INSPECTION - C1981038 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981038
>
2011-09-30_INSPECTION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:33 PM
Creation date
4/12/2012 10:09:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Inspection
Doc Date
9/30/2011
Doc Name
Email sent Operator attached with Inspection Report sent via Email (Coversheet)
From
DRMS
To
Basil Bear
Inspection Date
9/20/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 20, 2011 C -19 81 -038 /Bowie No. 1 Mine JJD <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 7 <br /> <br /> <br />During the May 26, 2011 OSM Fed eral inspection, it had been thought that, possibly, there was no gradient to a <br />section of the West Ridge waste pile upland diversion ditch. The operator surveyed the ditch and found t hat there <br />was a positive 1.19% flow gradient towards the road so the di tch was not redug. The resulting disturbance would <br />not have made it worthwhile (Figure 4). <br /> <br />There was no standing water in the two upper bin wall sediment ponds, ponds nos. 1 and 2, at the East Mine. As <br />had been documented in the Division’s July 27, 2011 inspection r eport, the tree branch that had become lodged in <br />the primary discharge tube was removed. This had been one of the issues during the May 26, 2011 Federal <br />inspection (Figure 3). Pond no. 2 had been recently cleaned out. The operator had spread the pond cleanings along <br />the reclaimed shoulder of the main dirt road and hydroseeded it. The discharge structures of the two ponds were <br />functional. <br /> <br />The two sediment ponds at the West Mine, ponds W -1 and W -2, were also dry. Pond embankments were grassed <br />and appeared to be stable. The open channel emergency spillways were free of any blockage. <br /> <br />The sediment pond at the reclaimed run -of -mine coal stockpile area was dry. The pond’s primary discharge gate <br />was closed. There was no debris in the open channel emergency spillway. The coll ection ditch leading to the pond <br />had ample capacity. Steven’s Gulch was flowing. <br /> <br />The bin wall sediment pond at the unit train loadout was dry as well. The upland diversion ditch and culverts were <br />in place on the north side of the pond. There was irrigatio n water flowing in the Farmer’s Ditch located underneath <br />the bin wall sediment pond. The collection ditch and half culvert downdrain were in place on the west side of the <br />loadout site. The upland diversion ditch and culvert system in the center of the load out site was operating properly <br />in passing the flow from irrigation. The pond at the partially reclaimed highway coal stockpile area was dry. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br /> The West Ridge waste pile had a good vegetative cover. The pile’s benches were stable. Also, the <br />terraces’ collection ditches were in place. The old waste pile also had a good vegetative cover and no signs of <br />slope instability were observed. <br /> <br />ROADS – Rul e 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> The operator had recently narrowed the former haul road at the East Mine by roughening up the shoulders <br />of the road. Since the last inspection, the shoulders of the narrowed dirt road had been hydroseeded. The pond no.2 <br />cleanings that had been spread out over the road’s shoulder looks a little artificial but, hopefully, will blend in over <br />ti me. Cross ditches had been cut into the road for drainage to the road side ditches. <br /> <br />The dirt road leading to the West Mine from Steven’s Gulch road was passable. Road culverts were functional. <br />The dirt entrance roads to the well field, reclaimed run -of -mi ne coal stockpile area and the partially reclaimed <br />highway coal stockpile area were passable. The dirt road leading to bin wall pond no. 1 was passable as well. The
The URL can be used to link to this page
Your browser does not support the video tag.