Laserfiche WebLink
October 20, 2011 C -1981 -041 /Roadside Portals MPB <br /> <br /> <br />Number of Partial Inspection this Fisc al Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 6 <br /> <br />with no significant erosion or other stability problems identified in past inspections. Sediment Pond #7 has now <br />been fully reclaimed along with two sumps adjacent to the permanent channel and the 18 -inch v -ditch that directed <br />runoff to Pond 7. The se reclaimed areas ha ve been seeded and mulched. Howev er, according to SCC shortly after <br />placing the mulch some strong winds blew a lot of it away. The mulch is somewhat sparse in the vicinity of Pond <br />7. SCC should monitor this and if necessary reapply mulch to the Pond 7 location. Photographs of before an d <br />after reclamation are shown for both Ponds 7 and 8 at the end of this inspection report. SCC did a good job of <br />backfilling the ponds and returning the grade at both locations to the approximate original contour. <br /> <br /> <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />