My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_INSPECTION - C1982056 (3)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2011-10-24_INSPECTION - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:17 PM
Creation date
4/10/2012 4:10:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
10/24/2011
Doc Name
Email sent to Operator attached with Inspection Report sent Via Email (Cover sheet)
From
DRMS
To
Jerry Nettleton
Inspection Date
10/17/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 17, 2011 C -1982 -056 /Foidel Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 9 <br /> <br />exception of the following: <br />- The sump located south of the railroad tracks and south of Pond B has neared capacity in terms of sediment. <br />This sump should be cleaned when dryer cond itions dictate to ensure adequate freeboard is maintained. <br />-The culvert at the intersection of the explosives area access road was damaged at the inlet. <br />-The culvert located to the north of the ROM stockpile and behind the vent fan was ¾ full of sediment at the inlet <br />as of the September inspection, TCC has addressed this issue.. <br />-The disturbance associated with the stability work located approximately halfway between the collection ditch on <br />the east side of the railway between the batch weigh loadout and the 24” culvert under the railway next to the <br />conveyor has generated erosional gullies and runoff into the collection ditch. This area was addressed as of this <br />inspection and repaired with proper sediment control in place in the collection ditch and at th e culvert. <br />-The material stockpile generated from the stability repair work was removed as requested and the site is s table <br />with no problems noted. <br /> <br /> <br />Sump East of Pond B and South of Railway <br /> <br />GENERAL MINE PLAN COMPLANCE: <br />The longwall miner continues to operate in the 17LT panel. Two coal trains w ere in the process of loading at the <br />time of the inspection. <br /> <br />TCC received and acknowledged receipt of NOV -2011 -005 on Monday September 12, 2011 during the inspection <br />of the site. The NOV abatement is ongoing at the time of this ispection. <br /> <br />OTHER (SPECIF Y): <br />This was a complete coal inspection of the Foidel Creek Mine conducted by Jason Musick of CDRMS
The URL can be used to link to this page
Your browser does not support the video tag.