Laserfiche WebLink
October 17, 2011 C -1982 -056 /Foidel Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 2 of 9 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y =Inspected N =Not Inspected R =Comments Noted V =Violation Issued NA =Not Applicable <br />Y - Air Resource Protection <br />R - Availability of Records <br />R - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />N - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />R - Other <br />R - Processing Waste <br /> <br />R - Roads <br />R - Reclamation Success <br />Y - Revegetation <br />Y - Subsidence <br />N - Slides and Other Damage <br />R - Support Facilities On -site <br />R - Signs and Markers <br />NA - Support Facilities Not On -site <br />NA - Special Categories Of Mining <br />Y - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br />All records were located at the TCC office. See attached DRMS Availability of Records. <br /> <br />BACKFILL and GRADING – Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br />Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilizati on of Rills and Gullies 4.14.6: <br />The 17LT concrete borehole pad was in the process of reclamation at the time of the inspection. The site was <br />backfilled with topsoil placement ongoing. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.0 5.3; Siltation Structures 4.05.5, 4.05.6 ; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2 ; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4 .05.9; Stream Buffer Zones 4.05.18: <br />Ponds B, C, D, E, F, G, 6NM, 18LT, 6NM sediment pond, the Fish Creek borehole ponds, the Fish Creek tipple <br />pond, and the Pit Pond were observed during the inspection. Discharge was noted at Ponds D and the Fish Creek <br />T ipple Pond. All other ponds were not discharging. All pond embankments were stable with no problems noted <br />with the exception of the following: <br />- The embankments of the 6MN holding pond will need to be reseeded in order to establish adequate vegetated <br />c over for stability. <br />- The 6MN Sediment pond embankment erosion has been addressed as of the September inspection. However, <br />further erosional gullies were observed to the west of the repair work. The erosional gully that had been repaired <br />as of the Septem ber inspection has continued to erode. According to Jerry Nettleton of TCC, the repair work on <br />this embankment will be completed by November 30, 2011. <br /> <br />All spillways were functioning as designed with no problems noted. <br /> <br />Ditches and culverts throughout the mine site were functioning as designed. No problems were noted with the