Laserfiche WebLink
October 19, 2011 C -1992 -081 /Hayden Gulch Loadout JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 5 <br /> <br />approved disturb ance areas. <br /> <br /> <br /> <br />OTHER (SPECIFY): <br />This was a complete coal inspection of the Hayden Gulch Loadout cond ucted by Jason Musick of CDRMS. The <br />loadout site was dry and the weather was clear at the time of the inspection. Reclamation activities continue at the <br />site. <br />DOCUMENTS RECEIVED <br />3 rd Quarter Impoundment inspection report <br /> <br />