My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-10_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-04-10_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 7:57:44 AM
Creation date
4/10/2012 3:10:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/10/2012
Doc Name
ANNUAL FEE/REPORT
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tim Cazier <br />April 9, 2012 <br />Page 13 <br />Weed control techniques were implemented within the Cresson Project area in the <br />summer of 2011 and will continue in 2012. <br />Per the requirements of C.R.S. 34 -32- 116(3), and C.R.S. 34- 32.5- 116(3)(a): <br />Reclamation accomplished to date: Approximately 354.5 acres <br />Reclamation accomplished during the preceding year: Approximately 44.5 acres of <br />disturbance associated with the Cresson Project were reclaimed in 2011 as described <br />above. <br />New disturbances anticipated during the upcoming year Continued development <br />of the Main Cresson, East Cresson (including backfilling in the ECME and Wildhorse <br />areas, and development of the WHEX area), associated haul roads, sediment control <br />measures, topsoil stockpiles, and other ancillary disturbances required to support these <br />activities will continue in 2012. <br />Mining in the Wildhorse area of the East Cresson has been completed and backfilling <br />activities within Wildhorse Mining Area were initiated in 2009. Backfilling in the East <br />Cresson (Altman and Wildhorse portions) will continue in 2012. Other construction <br />activities associated with Amendment No. 9 (including Phase 5 of the VLF and <br />expansion of the Squaw Gulch Overburden Storage Area) have been initiated and will <br />continue throughout 2012. <br />Reclamation anticipated during the upcoming year: Approximately 25 to 30 acres <br />of miscellaneous sites consisting of topsoil stockpiles, sediment ponds, and exploration <br />disturbances are planned to be reclaimed this year. <br />Reclamation /Closure Liability and Financial Warranty: <br />CC &V and DRMS have agreed on an additional warranty amount for Amendment No. 9. <br />The warranty amount of $54,280,734 will be posted in phases, which is consistent with <br />CRS 34- 32- 117(4)(b)(1). The first phase, or construction phase, was posted in 2008. <br />The second phase was posted in 2011 once the Phase 5 VLF liner was constructed and <br />certified. The financial instruments listed below currently cover the estimated <br />reclamation and closure costs associated with the Cresson Project through the reporting <br />period. <br />Per 2CCR 407 -1, 407 -4, and Rules 1.15(1)(a), St. Paul Fire and Marine Surety Bond <br />No. in the amount of $33,331,600.00, was submitted to DRMS on July 16, <br />2004. <br />
The URL can be used to link to this page
Your browser does not support the video tag.