Laserfiche WebLink
September 13, 2011 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 6 of 8 <br /> <br />noted. The entire North Facilities Area has been cleaned of all non -coal waste and, according to PSCM personnel, <br />currently being brought up to MSHAs current regulations. <br /> <br />S IGNS AND MARKERS – Rule 4.02: <br />Mine ID signs were in place at the require l ocations along County Road 27, 27A, and 51. The mine ID signs <br />displayed all required information. <br /> <br />TOPSOIL – Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4 .06.3; <br />Redistribution 4.06.4: <br />Topsoil salvaging and storage c ontinues in the area of the approved topsoil pile. Topsoil has been salvaged from <br />the area of the portal, the south coal handling facilities area, south facilities area, the slope east of the portal area <br />and various locations of ditches and roads. The to psoil pile has yet to be seeded as initial topsoil salvaging <br />continues. Diversion ditches are in place around the approved topsoil pile location. <br />Topsoil salvage and stockpile was active in the area of the Upper Sump. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />