My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-16_INSPECTION - C2009087 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2011-09-16_INSPECTION - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:11 PM
Creation date
4/10/2012 12:26:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
9/16/2011
Doc Name
Email Sent to Operator attached with Inspection Report sent via Email (Cover Sheet)
From
DRMS
To
Scott Cowman
Inspection Date
9/13/2011
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 13, 2011 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 5 of 8 <br /> <br /> <br /> <br /> <br />OTHER (SPECIFY): <br />This was a complete coal inspection conducted by Jason Musick of CDRMS. Scott Cowman of PSCC <br />accompa nied the inspection. The weather was clear and the site was dry during the inspection. Construction <br />activities continue at the site with topsoil salvaging and storage, construction of the sediment control system and <br />access and haul roads, and the develop ment of facilities areas. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Rec lamation 4.03.1(7)/4.03.2(7): <br />The widening of existing haul roads A -1 and D is complete. These roads were initially widened through the <br />Seneca II permit, but were reclaimed. Road B, Road F, and the southern portion of Road D construction was on - <br />going at the time of the inspection. No problems were noted. Existing roads in and aro und the facilities area were <br />stable with water being applied for dust suppression. No problems were observed. <br /> <br />SU PPORT FACILITIES - Rule 4.04: <br />No new facilities have yet to be constructed on site. Previously constructed facilities are stable with no pr oblems
The URL can be used to link to this page
Your browser does not support the video tag.