September 13, 2011 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 5 of 8 <br /> <br /> <br /> <br /> <br />OTHER (SPECIFY): <br />This was a complete coal inspection conducted by Jason Musick of CDRMS. Scott Cowman of PSCC <br />accompa nied the inspection. The weather was clear and the site was dry during the inspection. Construction <br />activities continue at the site with topsoil salvaging and storage, construction of the sediment control system and <br />access and haul roads, and the develop ment of facilities areas. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Rec lamation 4.03.1(7)/4.03.2(7): <br />The widening of existing haul roads A -1 and D is complete. These roads were initially widened through the <br />Seneca II permit, but were reclaimed. Road B, Road F, and the southern portion of Road D construction was on - <br />going at the time of the inspection. No problems were noted. Existing roads in and aro und the facilities area were <br />stable with water being applied for dust suppression. No problems were observed. <br /> <br />SU PPORT FACILITIES - Rule 4.04: <br />No new facilities have yet to be constructed on site. Previously constructed facilities are stable with no pr oblems