Laserfiche WebLink
November 15, 2011 C -2009 -087 /Peabody Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fi scal Year: 2 <br /> <br /> Page 4 of 7 <br /> <br /> <br />Lower Sump <br /> <br />GENERAL MINE PLAN COMPLANCE: <br />The Peabody Sage Creek Mine was permitted in 2010 with initial construction activities beginning in May 2011. <br />At the time of the inspection, topsoil salvaging and storage is complete. The construction of ditches, construction <br />of the facilities area, and the construction of south facilities is ongoing. <br /> <br />Portal Sumps and Wire Mesh Installation <br /> <br />OTHER (SPE CIFY): <br />This was a complete coal inspection conducted by Jason Musick of CDRMS. Jay James of Peabody Energy <br />accompanied the inspection. The weather was cloudy and the site was wet and snow covered during the <br />inspection. Construction activities continue at the site with the development of facilities areas. Development of <br />the portals has yet to occur. Steel mesh was being installed on the highwall face at the portal area. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and