Laserfiche WebLink
September 21, 2011 C -1981 -010 /Trapper Mine RDZ <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 5 of 10 <br /> <br />Per Mr. Nicholson, the ASH -10 topsoil pile will be used in reclamation this fall. Weeds have grown on this pile <br />over the summer to provide some stabilization until the soil is hauled away. <br /> <br />Identification markers have been adde d to the following topsoil piles: D93 -1, D97 -1, E94 -2, JG -7, and JG -8. <br />Markers are still needed at E94 -1 and E94 -2 (more needed than one that was added). <br /> <br />Rills on the north side of A1 -08 have healed well. <br /> <br />At the HRS pile (not inspected in May), more i dentification markers should be added. This pile also contains <br />some thistle. <br /> <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were taken as a result of this inspection , and none are pending. <br />