My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-28_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2012-03-28_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:33 PM
Creation date
4/9/2012 7:47:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
3/28/2012
Doc Name
Inspection Report
From
DRMS
To
William Bear
Inspection Date
3/28/2012
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 28, 2012 C- 1996 - 083 /Bowie No. 2 Mine BFB <br />main access haul road was in good condition and well maintained. The access road to the upper utility bench was <br />in good condition. The county road leading the Hubbard Creek Fansite had numerous large rocks in the road. <br />REVEGETATION — Rule 4.15 Vegetative Cover; Timing: <br />Bill Bear consulted with Webb Callicutt, Delta County Weed Coordinator, and created a treatment plan <br />for the cheatgrass (Bromus tectorum) on the topsoil stockpiles. Two weeks prior to this inspection, the grass duff <br />and cheatgrass was burned on topsoil stock pile A and Gob Pile 43 topsoil stockpile and coverfill stockpile. A <br />follow -up chemical treatment will take place later in the season. No cheatgrass was seen in the burn treated areas. <br />The Hubbard Creek Fansite was reclaimed last fall. At the time of this inspection no vegetation was sprouting in <br />the reclamation area (photo 1). The Dove Gulch Road reclamation was covered with large mulch and had <br />vegetation sprouting. <br />SUPPORT FACILITIES - Rule 4.04: <br />The shaft for the Terror Creek Ventilation Shaft is bored. A footing was being constructed for the <br />equipment need to line the shaft with concrete. It is expected to take 3 months to line the bore hole. <br />SIGNS AND MARKERS — Rule 4.02: <br />Several disturbance boundary markers have been knocked over and need to be reset. A topsoil stockpile <br />sign is on the gob pile 42 east cover fill stockpile. This sign needs to be removed. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 9 <br />