Laserfiche WebLink
January 17, 2012 C -2009 -087 /Peabod y Sage Creek Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 4 <br /> <br />GENERAL MINE PLAN COMPLANCE: <br />The Peabody Sage Creek Mine was permitted in 2010 with initial construction activities beginning in May 2011. <br />At the time of the inspection, topsoil salvaging and storage is c omplete. Operations at the South Facilities are idle. <br />The only activities identified during the inspection were work at the electrical substation and within the North <br />Facilities Area at the location of the bathhouse. <br /> <br />Portal Area South facilities area pad <br /> <br />OTHER (SPECIFY): <br />This was a partial coal inspection conducted by Jason Musick of CDRMS. The weather was clear and the site <br />was wet and snow covered during the inspection. Activities at the site are confined to the North Facilities Area <br />with activities in the South Facilities Area idle. <br /> <br />ROA DS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Rec lamation 4.03.1(7)/4.03.2(7): <br />Roads were snow -covered throughout the South Facilities Area. Plowing operatio ns were evident from RCR 27 to <br />the North Facilities Area to the gate at Pond 002. No problems were noted. <br /> <br /> <br />