Laserfiche WebLink
r *jjUMUTEA't9M <br />jo[C'JJL <br />Task <br />Form <br />Fleet <br />Task <br />Descri tion <br />Used <br />Size <br />Hours <br />Cost <br />005 <br />Grade Drill Pads Associated with Minor Revision <br />DOZER <br />2 <br />1.09 <br />$966,57 <br />18 <br />010 <br />L�i2 Permanent Roads <br />RIPPER <br />2 <br />333 <br />$3,534.00 <br />Olt <br />Rig Haul Roads <br />RIPPER <br />2 <br />15.46 <br />$14,641,00 <br />012 <br />RiE Facilities Area <br />KIPPER <br />2 <br />2.66 <br />$2,524.00 <br />013 <br />jAplosives Area <br />RIPPER <br />2 <br />'7 <br />1:97 <br />$1,868,00 <br />014 <br />—Rip <br />Rip Final Regraded Areas <br />RIPPER <br />10.66 <br />th <br />$10,097.00 <br />018 <br />Narrow Permanent Roads <br />DOZER <br />2 <br />5.26 <br />5 6 <br />$4,67154 <br />019 <br />Grade Permanent Roads to Blend <br />GRADER <br />1 <br />30.13 <br />3 1 3 <br />$4,04900 <br />020 <br />Grade Haul Roads to Blend <br />GRADER <br />1 <br />6897 <br />$9,268.00 <br />021 <br />Grade Light-Use Roads, <br />GRADER <br />1 <br />9;07 <br />$1,219.00 <br />022 <br />Regrade Access Road to Drill Pad 42 from Minor <br />DOZER <br />2 <br />0AI <br />$3660 <br />Revision 18 <br />023 <br />ESff n2orary Access Road to Pond 010 <br />.. aide TEL <br />DOZER <br />0,58 <br />$516.97 <br />024 <br />Grade Haul Road Surface Material into Fill <br />DOZER <br />2 <br />24.50 <br />S21,766,80 <br />025 <br />Grade Facilities Area Surface Material into Fill <br />DOZER <br />1 <br />3,00 <br />$2,667,09 <br />028 <br />Finish Grade All Areas <br />GRADER <br />t <br />33.76 <br />$4,419. 00 <br />02a <br />Grad: <br />Grade Valora Pit N/S Righwall <br />DOZER <br />2 <br />6194 <br />$55,926.55 <br />02^11,b <br />Grade Valora Pit E/W (Scraper Pit) Highwall <br />DOZER <br />2 <br />7.80 <br />$6,932.15 <br />02f <br />Neck Pit Highwall <br />DOZER <br />? <br />1."78 <br />$1,583.57 <br />030 <br />Regrade Pond 010 <br />DOZER <br />1 <br />54.00 <br />$14J02.80 <br />031 <br />Regrade, Pond 011 <br />DOZER <br />1 <br />30.20 <br />$7,887.22 <br />032 <br />Regrade Pond. -012 <br />DOZER <br />1 <br />96.23 <br />$25,130.24 <br />033 <br />Re rade Pond 0 14 <br />DOZER <br />1 <br />53.58 <br />$13,991.85 <br />034 <br />Regrade All Ditches <br />GRADER <br />1 <br />1122 <br />$1,65100 <br />035 <br />Construct Post-Mining Drainage Channels <br />EXCAVATE <br />1 <br />444.69 <br />$186,319.47 <br />036 <br />Regrade Pond I I A <br />DOZER <br />t <br />28.63 <br />$7,477.28 <br />037 <br />Regrade Pond 12 A <br />DOZER <br />1 <br />44,72 <br />S 1 1,678:711 <br />03a, <br />Grade Valora Pit N/S Spoil Ridges <br />DOZER <br />2 <br />22.77 <br />$20,230.89 <br />03b <br />Grade Valora Pit E/W (Scraper Pit) S' oil Ridges <br />DOZER <br />2 <br />3.98 <br />$3,538.79 <br />03f <br />Grade Neck Pit Spoil Rid es <br />DOZER <br />2 <br />0.91 <br />$807.94 <br />040 <br />Re lace To sail from Stockpile A to Pond 010 <br />SCRAPERI <br />2 <br />20.76 <br />$34,253.84 <br />041 <br />Replace TqpsoiI -froni_Stockpi.le B to Shop Area <br />SCRAPERI <br />2 <br />15.70 <br />$25,895:79 <br />043 <br />Replace Topsoil from Stockpile Haul Fill from to <br />SCRAPER] <br />2 <br />30.18 <br />549,789.13 <br />Neck Pit <br />044 <br />Replace Topsoil from Stockpile I to Entrance Road <br />SCRAPERI <br />57.67 <br />$95,14185 <br />and Wadge <br />046 <br />Replace Topsoil from Stockpile L to Unreleased <br />SC RAP ERI <br />2 <br />73.72 <br />$121,619.23 <br />