Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.70 Minutes <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />TraNTel Tune: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency; <br />0.830 <br />NA <br />(CAT HB) <br />Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />TraNTel Tune: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1600.00 <br />100 <br />500 <br />7.00 <br />1044 <br />1.59 <br />Haul Time: 1.59 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />Scraper(s) <br />237.05 <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />1600.00 <br />-2.00 <br />5.00 <br />3.00 <br />2870 <br />0.77 <br />Return Time: <br />Total Scraper team cN, cle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit productionihour: 285.61 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost $0.947 /LCY <br />0.77 <br />minutes <br />3.96 <br />minutes <br />237.05 <br />LCY/Hour <br />1 <br />Scraper(s) <br />237.05 <br />LCY/Hour <br />237.05 <br />LCY/Hour <br />Total job time: 19.22 Hours <br />Total jab cost: $4,315.36 <br />CIRCES Cost Estimating Software <br />