Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Mine Waste Pile <br />Permit Action: 2012 Bond <br />Site: Northfield Mine Recalculation Permit /Job #: C2006085 <br />PROJECT IDENTIFICATION <br />Task #: 045 State: Colorado Abbreviation: None <br />Date: 1/25/2012 County: Fremont Filename' 0085 -045 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 621 G <br />Dozer: NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />COSTShiftbasis: 1 per dad <br />Cost Breakdown: Scraper Work Team SUDDort Equipment Maintenance Eauian ent <br />Total work team cost/hour: $224.52 <br />MATERIAL OUANTITIES <br />Initial volume: 4,050 CCY Swell factor: 1.125 <br />Loose volume: 4,556 LCY <br />Source of estimated volume: Page 2,05.4 -7: Map 12 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry' packed <br />RatedPavload: 52,800 pounds <br />Payload Capacity 20.71 LCY <br />Scraper Bowl (volume) Basis: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$66.52 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$133.06 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$224.52 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$224.52 <br />Support: <br />$0.00 <br />Maint <br />$0.00 <br />Total work team cost/hour: $224.52 <br />MATERIAL OUANTITIES <br />Initial volume: 4,050 CCY Swell factor: 1.125 <br />Loose volume: 4,556 LCY <br />Source of estimated volume: Page 2,05.4 -7: Map 12 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,550 lbs/LCY <br />Material description: Earth - Dry' packed <br />RatedPavload: 52,800 pounds <br />Payload Capacity 20.71 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />