My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-25_REVISION - C2006085
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2006085
>
2012-01-25_REVISION - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:56 PM
Creation date
4/3/2012 12:25:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Revision
Doc Date
1/25/2012
Doc Name
Bond Liability Recalculation (Emailed)
From
Jim Stark
To
Janet Binns
Type & Sequence
TR1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description <br />Site: Northfield Mine <br />BULLDOZER WORK <br />ade Facilities Area <br />Pen-nit Action: 2012 Bond <br />Recalculation <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 1/24/2012 County Fremont <br />User: JRS <br />Agency or organization name: DRMS <br />Permit /Job #: C2006085 <br />Abbreviation: None <br />Filename C085 -001 <br />HOURLY EQUIPMENT COST <br />Initial Volume: <br />Basic Machine: CatD9T - 9SU <br />Sjv ell factor: <br />1.165 <br />Horsepower: 405 <br />44,503 LCY <br />Blade Type: Semi- Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cast Breakdown: <br />Utilization %6 <br />OJynership Cost/Hour: <br />$72:10 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />38,200 <br />Sjv ell factor: <br />1.165 <br />Loose volume: <br />44,503 LCY <br />Source of estimated volume: Exhibit AC Maps 11 and 12 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 10% <br />Average site altitude: 5,400 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.