Laserfiche WebLink
Task description: <br />Site: Northfield Mine <br />COST SUMMARY <br />2012 Bond Recalculation Summary <br />PROJECT IDENTIFICATION <br />Task #: 000 <br />Date: 1/25/2012 <br />User: JRS <br />Permit Action: 2012 Bond <br />Recalculation Pennit /Job #: C2006085 <br />State: Colorado <br />Countv: Fremont <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: None <br />Filename: C085 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />006 <br />007 <br />008 <br />009 <br />014 <br />015 <br />016 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />030 <br />035 <br />036 <br />037 <br />038 <br />039 <br />040 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />051 <br />055 <br />Regrade Facilities Area <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />227.54 <br />$57,241.15 <br />$151.45 <br />$431.05 <br />$296:05 <br />$3,347.00 <br />$6,891:67 <br />$8;436.00 <br />$124.00 <br />$8,535.00 <br />$1;469.00 <br />$2;321,57 <br />$150.00 <br />$815.87 <br />$87.00 <br />$46431 <br />$1;457.00 <br />$1,709.26 <br />$243.80 <br />$186.17 <br />$155.15 <br />$155.15 <br />$20,760.25 <br />$4,31536 <br />$15,146.66 <br />$2;484.75 <br />$469.00 <br />$362.75 <br />$141.83 <br />$75,64 <br />$49,721.30 <br />Regrade South Fan Area <br />DOZER <br />0.60 <br />Haul Footprint of Raw Coal Stockpile to Waste <br />Fill Pile <br />SCRAPERI <br />1.92 <br />Haul Footprint of Clean Coal Stockpile to Waste <br />Fill Pile <br />SCRAPERI <br />1.32 <br />Compact Mine Waste and Coal Stockpile <br />Footprints at Mine Was <br />COMPACT <br />25.58 <br />Place Approximatelv Three Feet of Cover on <br />Waste Fill Pile <br />SCRAPERI <br />30;70 <br />Rip Facilities Area <br />RIPPER <br />31.65 <br />Rip South Fan Area <br />RIPPER <br />0.46 <br />Rip Regraded Areas Prior to Topsoil Replacement <br />RIPPER <br />32.02 <br />Rip Haul Road Prior to Regrading <br />RIPPER <br />5.51 <br />Regrade Haul Road <br />DOZER <br />9.23 <br />Rip Access Road to South Fan Prior to Regrading <br />RIPPER <br />0.56 <br />Regrade Access Road to South Fan <br />DOZER <br />3.24 <br />Rip Light -Use Road to Pond 1 Prior to Regrading <br />RIPPER <br />0.32 <br />Regrade Light -Use Road to Pond 1 <br />DOZER <br />1.85 <br />Finish Grade Disturbed Areas <br />GRADER <br />15.67 <br />Regrade Pond 1 <br />DOZER <br />8.21 <br />Regrade North Run -On Diversion Ditch <br />DOZER <br />1.17 <br />Regrade South Run -On Diversion Ditch <br />DOZER <br />0.89 <br />Regrade North Run -Off Diversion Ditch <br />DOZER <br />0.75 <br />Regrade South <br />DOZER <br />0.75 <br />Remove Chandler Creek Crossing at Haul Road <br />DEMOLISH <br />120.00 <br />Replace Topsoil from Stockpile to Mine Waste <br />Pile <br />SCRAPERI <br />19.22 <br />Replace Topsoil from Stockpile to Facilities Area <br />SCRAPERI <br />67.46 <br />Replace Topsoil from Stockpile to Pond 1 <br />SCRAPERI <br />11.07 <br />Replace Topsoil from Stockpile to South Fan Area <br />DOZER <br />1.80 <br />Replace Topsoil from Stockpile to Haul Road <br />SCRAPERI <br />1.62 <br />Replace Topsoil from Stockpile to Power Line <br />Light -Use Road <br />SCRAPERI <br />0.63 <br />Replace Topsoil from Stockpile to Vent Shafts <br />Light -Use Road <br />SCRAPERI <br />0.34 <br />Seal Portal and Vent Shafts <br />MINESEAL <br />120.00 <br />CIRCES Cost Estimating Soffi are <br />