My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-11-17_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
4/3/2012 12:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
11/17/2011
Doc Name
Memo Regarding Completion of Yoast Mine & Cost Estimate
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 114 <br />Dozing method: <br />Visibility <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -0C) <br />1.516 <br />(CAT HB) <br />0.930 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.9579 <br />Adjusted unit production: 1;951.05 LCY /hr <br />Adjusted fleet production: 3902.1 LCY/hr <br />JOB TIME AND COST <br />Fleet size: <br />2 Dozer(s) <br />Unit cost: <br />$0.228/LCY <br />Total job time: <br />62.94 Hours <br />Total job cost: <br />$55,926.55 <br />Yoast Mille C-1994-082 Partial Phase 11 Bond Release SL -02 CIRCES Cost Estimating. Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.