My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-11-17_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
4/3/2012 12:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
11/17/2011
Doc Name
Memo Regarding Completion of Yoast Mine & Cost Estimate
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Gracie Valora Pit N/S High«,all <br />Pen-nit Action: Partial Phase II Bond <br />Site: Yoast Mine Release SL -03 <br />PROJECT IDENTIFICATION <br />Task #: 02A <br />Date: 08- Nov -11 <br />User: JRS <br />State: <br />Countvi <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11R - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cast Breakdown <br />Page 4 of 114 <br />Pennit /Job #: C1994082 <br />Abbreviation: None <br />Filename: 0082 -02a <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Sjv ell factor: <br />Loose volume: <br />245,600 <br />1.000 <br />245,600 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 10 feet <br />Unadjusted hourly production: 2,036.8 LCY /lir <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />-25 % <br />7,800 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill: 0:750 AVG. <br />Material consistency: 1.100 (CAT HB) <br />Toast Kline C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />Utilization % <br />OJvnership Cost/Hour: <br />$131.18 <br />NA <br />Operating Cost/Hour: <br />$274.62 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $444.28 <br />Total Fleet Cost/Hour: $888.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Sjv ell factor: <br />Loose volume: <br />245,600 <br />1.000 <br />245,600 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 10 feet <br />Unadjusted hourly production: 2,036.8 LCY /lir <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />-25 % <br />7,800 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill: 0:750 AVG. <br />Material consistency: 1.100 (CAT HB) <br />Toast Kline C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.