My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-11-17_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
4/3/2012 12:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
11/17/2011
Doc Name
Memo Regarding Completion of Yoast Mine & Cost Estimate
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CN-cle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Tune: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Page 69 of 114 <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm smooth, rollin , dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />0.980 <br />NA <br />(CAT HB) <br />Job Efficiencv: <br />0.830 <br />NA <br />(CAT HB) <br />Page 69 of 114 <br />Site Altitude: 7800 feet <br />Net Correction: 0.813 NA <br />Travel Time: <br />Road Condition: Firm smooth, rollin , dirt/lt. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />-7.10 <br />3.00 <br />-4.10 <br />2972 <br />0.53 <br />Haul Time: 0.53 minutes <br />R etiim R orate <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />7.10 <br />3.00 <br />10.10 <br />1476 <br />1.00 <br />Return Time: <br />1.00 <br />minutes <br />Total Scraper team cycle time: <br />3.13 <br />minutes <br />Adjusted for job conditions: <br />903.91 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourlyproduction` <br />903.91 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,807.82 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,111.82 LCY/Hour <br />Optimal Number of Scrapers per push dozer <br />JOB TIME AND COST <br />Fleet size: 2 <br />Team(s) <br />Unit cost: $0.913 /LCY <br />Total job timer 15.70 Hours <br />Total job cost: $25,895.79 <br />Yoast Mine C -1994 -082 Partial Phase II Bond Release SL -02 CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.