My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2011-11-17_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
4/3/2012 12:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
11/17/2011
Doc Name
Memo Regarding Completion of Yoast Mine & Cost Estimate
From
Jim Stark
To
Susan Burgmaier
Type & Sequence
SL3
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 68 of 114 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile B to Shop Area <br />Permit Action: Partial Phase II Bond <br />Site: Yoast Mine Release SL -03 Perinit /Job #: C 1994082 <br />PROJECT IDENTIFICATION <br />Task #: 041 State: Colorado <br />Date: 08- Nov -I1 County: Routt <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />Dozer: NA <br />Abbreviation: None <br />Filename: 0082 -041 <br />COSTShiftbasis: 1 per dad <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraper Work Team SuDDort Equipment Maintenance Eauian ent <br />Total work team cost/hour: $1,649.70 <br />MATERIAL OUANTITIES <br />Initial volume: 25,451 CCY Swell factor: 1.11 <br />Loose volume: 28,378 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost /hour: <br />$103.90 <br />NA <br />NA <br />NA <br />$39.30 <br />$54.68 <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />$16.78 <br />$29.31 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$24.95 <br />NA <br />NA <br />NA <br />$24.47 <br />$38.70 <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />$80.54 <br />$122.68 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,446.48 <br />Support: <br />$0.00 <br />Maint <br />$203.22 <br />Total work team cost/hour: $1,649.70 <br />MATERIAL OUANTITIES <br />Initial volume: 25,451 CCY Swell factor: 1.11 <br />Loose volume: 28,378 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 lbs/LCY <br />Material description: <br />Earth - Loam <br />RatedPavload: <br />811,600 pounds <br />Payload Capacity: <br />38.86 LCY <br />Average Volume: <br />Yoast Mine C -1994 -082 Partial Phase It Bond Release SL -02 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity-: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.