Laserfiche WebLink
Scraper Worksheet Cont'd Task # 30A Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />0.60 Minutes <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 I 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced watered maintained 3.0 <br />Haul Route- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />(CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 I 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced watered maintained 3.0 <br />Haul Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />(% <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />350.00 <br />0.00 <br />3.00 <br />3.00 <br />2800 <br />0.36 <br />Haul Time: 0.36 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />%) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />350.00 <br />0.00 <br />3.00 <br />3.00 <br />2949 <br />0.26 <br />Return Time: <br />0.26 <br />minutes <br />Total Scraper team cycle time: <br />1.82 <br />minutes <br />Adjusted for job conditions: <br />793.52 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s). <br />Adjusted single scraper team (unit) hourly production: <br />1,587.03 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />3,174.07 <br />LCY/Hour <br />Unadjusted unit production/hour: 956.04 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 <br />Team(s) <br />Unit cost: $0.448 /LCY <br />Total job time: <br />Total job cost: <br />50.45 Hours <br />$71,773.75 <br />CIRCES Cost Estimating Software <br />