Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />Page I of 2 <br />SCRAPER TEAM WORK <br />Replace topsoil on 20.02 ac Morgan property, Zones 1 -2 <br />Permit Action: Phase II/III Bond <br />Release SL -12 and <br />PR -6 Permit/7ob #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30A State: Colorado <br />Date: 11/18/2011 County: Montrose <br />User: SLB <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />Abbreviation: None <br />Filename: C008 -30a <br />COSTShift basis: 1 per day <br />- Scraper: <br />- Dozer: <br />Cat 637G <br />NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />o..-....,... w,.A. rre.,.., Qnr -t Fm.inment Maintenance Equinment <br />Total work team cost/hour: $1,422.80 <br />MATERIAL QUANTITIES <br />Initial volume: 145,561 CCY Swell factor: 1.100 <br />Loose volume: 160,117 LCY <br />Source of estimated volume: Map 2.05.4 -6, 21" A/B, 33" subsoil <br />Source of estimated swell factor: Division estimate <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$1,422.80 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $1,422.80 <br />MATERIAL QUANTITIES <br />Initial volume: 145,561 CCY Swell factor: 1.100 <br />Loose volume: 160,117 LCY <br />Source of estimated volume: Map 2.05.4 -6, 21" A/B, 33" subsoil <br />Source of estimated swell factor: Division estimate <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,1001bs /LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />