Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />MOTOR GRADER WORK <br />—Rip spoil/topsoil interface <br />Permit Action: Phase II/III Bond <br />Release SL -12 and <br />PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 010 <br />Date: 10/21/2011 <br />User: SLB <br />State: Colorado <br />County: Montrose <br />Agency or organization name: <br />nRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: Multi -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Abbreviation: None <br />Filename: C008 -010 <br />Horsepower: <br />Shift Basis: <br />Data Source: <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />$137.61 <br />20.00 <br />259 <br />1 per day <br />(CRG) <br />Source of estimated acreage: Map 2.05.3(3) -2 and Division Aerial Photographs <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />1.50 <br />mph <br />Ripping (0 -3 mph) - 1.50 <br />Utilization % <br />$42.77 <br />0.00 <br />NA <br />$67.12 <br />feet <br />100 <br />$3.25 <br />1.5455 <br />100 <br />$24.47 <br />NA <br />$137.61 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />$137.61 <br />20.00 <br />259 <br />1 per day <br />(CRG) <br />Source of estimated acreage: Map 2.05.3(3) -2 and Division Aerial Photographs <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />1.50 <br />mph <br />Ripping (0 -3 mph) - 1.50 <br />-1 <br />degrees <br />0.00 <br />feet <br />2.00 <br />feet <br />8.50 <br />feet <br />1.5455 <br />acres /hour <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1 sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Site Altitude: 5700 feet <br />1.3909 <br />1.3909 <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: <br />acres/Hour <br />acres/Hour <br />14.38 Hours <br />Unit cost: $98.94 per acre Total job cost: $1,979.00 <br />CIRCES Cost Estimating Software <br />