Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />MOTOR GRADER WORK <br />Final grade disturbed areas (not bond released) <br />Permit Action: Phase II/III Bond <br />Release SL -12 and <br />PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 009 State: Colorado <br />Date: 10/21/2011 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C008 -009 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $130.88 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />468.60 <br />acres <br />Source of estimated acreage: SL -12 App: 768.6 disturbed ac less 300 ac Ph II SL -11 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />3.25 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$39.30 <br />0 <br />NA <br />Operating Cost/Hour: <br />$67.12 <br />feet <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Net grading or ripping width per pass: <br />12.00 <br />Operator Cost/Hour: <br />$24.47 <br />4.7273 <br />NA <br />Total Unit Cost/Hour: <br />$130.88 <br />Site Altitude: 5700 feet <br />Total Fleet Cost/Hour: $130.88 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />468.60 <br />acres <br />Source of estimated acreage: SL -12 App: 768.6 disturbed ac less 300 ac Ph II SL -11 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />3.25 <br />mph <br />Selected Application: <br />Heavy blading (0 -6 mph) - 3.25 <br />Selected Blade Angle: <br />0 <br />degrees <br />Effective Blade Length: <br />14.00 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />12.00 <br />feet <br />Unadjusted Hourly Unit Production: <br />4.7273 <br />acres /hour <br />Job Condition Correction Factors <br />Site Altitude: 5700 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />4.2545 <br />4.2545 <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: <br />acres/Hour <br />acres/Hour <br />110.14 Hours <br />Unit cost: $30.76 per acre Total job cost: $14,415.00 <br />C[RCES Cost Estimating Software <br />