Laserfiche WebLink
Surface Blasting Work Cont'd <br />Task# 004 Page 3 of 3 <br />Total Materials Cost: <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: <br />135 <br />linear feet <br />Unadjusted Drilling Rate: <br />187.00 <br />feet/hour <br />Drilling Time: <br />1.14 <br />hours <br />Job Condition Corrections: <br />Site Altitude: <br />5,700 <br />feet <br />Altitude Adjustment: <br />0.95 <br />(DRMS est.) <br />Job Efficiency Factor: <br />0.67 <br />(CH. Exc. HB) <br />Adjusted Drilling Rate: <br />119.03 <br />feet/hour <br />Explosives Prep. Time: <br />4.45 <br />hours <br />JOB TIME AND COST <br />Total Job Time: <br />5.59 Hours <br />Unit cost: $1.217 per cu. yd. <br />Total Job Cost: <br />$1,280.08 <br />$633.79 <br />CIRCES Cost Estimating Software <br />