Laserfiche WebLink
Surface Blasting Work Cont'd <br />BLASTING MATERIALS QUANTITIES <br />Task# 004 <br />Page 2 of 3 <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery —Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />!`net Rrnakrinwn• Fnninment Preparation Sunnort Sunnort Bulk Truck Cap Truck <br />UANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />0.45 <br />cubic yards <br />Total Quantity of Explosives Required: <br />767 <br />pounds <br />Total Quantity of det. cord/fuse /wire Required: <br />593 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />1 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />26 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />26 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />27 <br />delays <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: ATLAS COPCO ROC L6,6.0 in. <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: NA <br />Misc. Explosives Support Equipment: NA <br />Explosives Delivery —Bulk Truck: ANFO Bulk Delivery Truck <br />-Cap Truck: NA <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />!`net Rrnakrinwn• Fnninment Preparation Sunnort Sunnort Bulk Truck Cap Truck <br />Total work team cost/hour: $278.76 <br />MATERIALS COST <br />Drilling <br />Unit <br />Unit Cost <br />Quantity <br />MiscTruck <br />Blasting Agent: <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />15 <br />NA <br />Ownership cost/hour: <br />$54.87 <br />NA <br />NA <br />NA <br />$67.53 <br />NA <br />Operating cost/hour: <br />$99.19 <br />NA <br />NA <br />NA <br />$12.31 <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />NA <br />Operator cost/hour: <br />$25.37 <br />NA <br />NA <br />NA <br />$19.49 <br />NA <br />Unit Subtotals: <br />$179.43 <br />$0.00 <br />$0.00 <br />$0.00 <br />$99.33 <br />$0.00 <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />1 <br />0 <br />Group Subtotals: <br />$179.43 <br />$0.00 <br />$0.00 <br />$0.00 <br />$99.33 <br />$0.00 <br />Total work team cost/hour: $278.76 <br />MATERIALS COST <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Blasting Agent: <br />Bulk ANFO nom. density ( <br />7,900 - 15,000 s) <br />Pound <br />$0.234 <br />767.433 <br />$179.58 <br />Primers or Boosters: <br />Cast primer, 0.3 lb (electric <br />or non - electric system) <br />Each <br />$2.885 <br />26.000 <br />$75.01 <br />Blasting Caps: <br />Non - electric cap, delay <br />(non - electric systems) <br />Each <br />$3.489 <br />26.000 <br />$90.71 <br />Det. Cord, fuse, or <br />wire: <br />Detonating cord, 10 gr. /ft. <br />(non - electric systems) <br />Linear foot <br />$0.119 <br />593.120 <br />$70.58 <br />Delays: <br />MS connectors (non- <br />electric systems) <br />Each <br />$4.914 <br />27.000 <br />$132.68 <br />Miscellaneous: <br />0.000 <br />$0.00 <br />Drill bits: <br />Bit life = 2,600 <br />Linear feet <br />$1,639.00 <br />0.052 <br />$85.23 <br />CIRCES Cost Estimating Software <br />