Laserfiche WebLink
Table 2.06.6-1 Rule 2.06.6 Requirements <br />ItemLocation of Response <br />A - Soil Survey and Identification ofPrimeSection 2.04.9: <br />sub-section 10.0 <br />Farmlands <br />Attachment2.04.9-6 <br />B- Topsoil Removal andReplacementSection 2.04.9: <br />sub-sections16.4 & 16.5 <br />Methodology <br />Section 2.05.4(2)(d): <br />sub-sections11.0 <br />C - Topsoil Stockpile and Storage PlansSection 2.05.4(2)(d): <br />sub-section 8.0,12.1,& 13.1 <br />Maps 2.05.4-4,2.05.4-6,& 2.05.4 -8 <br />D - Suitable Subsoil DocumentationSection 2.05.4(2)(d): <br />sub-section 6.0,7.0,11.0, & 14.0 <br />Attachment2.05.4(2)(d)-1 <br />E - Revegetation PlansSection 2.05.4(2)(e): <br />sub-sections5.0 & 9.0 <br />Map 2.05.4-5 <br />Attachment 2.04.9-6 & Attachment <br />F- Certificationof ProposedPlans <br />2.05.4(2)(e)-11 <br />Attachment2.04.9-6 <br />G - NRCS Determination ofPrime <br />Farmland Productivity <br />H - Return ofSoil ProductivitySection 2.05.4(2)(e): <br />sub-sections5.6, 5.7,5.5.2,5.5.3,& 5.5.4 <br />Section 2.05.4(2)(d): <br />sub-sections13.1 & 14.0 <br />Attachment2.05.4(2)(e)-3 <br />2.04.9-4 <br />(Revised June2010) <br />